Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 35 results ...

Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues, Unpublished PhD Thesis, TRITA-TSC-PHD, KTH Royal Institute of Technology.

Anund Vogel, J (2020) Incentivising Innovation in the Swedish Construction Industry, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Borg, L (2015) Procurement contracts, innovation and productivity in the construction sector: Five studies, Unpublished PhD Thesis, TRITA-FOB-DT, KTH Royal Institute of Technology.

Brunes, F (2015) Essays on behavioural economics and cost overuns, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Butt, A A (2014) Life cycle assessment of asphalt roads: Decision support at the project level, Unpublished PhD Thesis, TRITA-TSC-PHD, KTH Royal Institute of Technology.

Clausen Mork, J (2012) Dealing with uncertainty, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Eliufoo, H K (2005) Knowledge creation and transfer in construction organisations in Tanzania, Unpublished PhD Thesis, Trita-BFE, KTH Royal Institute of Technology.

Faith-Ell, C (2005) The application of environmental requirements in procurement of road maintenance in Sweden, Unpublished PhD Thesis, Trita-LWR. PHD, KTH Royal Institute of Technology.

Francart, N (2021) Decision support for the implementation of low-carbon measures in the building sector, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.

Gohardani, N (2014) An approach towards sustainable building, Unpublished PhD Thesis, TRITA-BYTE, KTH Royal Institute of Technology.

Högberg, L (2014) Building sustainability: Studies on incentives in construction and management of real estate, Unpublished PhD Thesis, TRITA-FOB, KTH Royal Institute of Technology.

Hedborg, S (2022) ”It’s in the between”: Inter-Project Organising in Project Ecologies, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Irumba, R (2015) Modelling of construction safety performance and housing markets in kampala, Uganda, Unpublished PhD Thesis, Trita-KTH-CEFIN-DT, KTH Royal Institute of Technology.

Jägbeck, A (1998) IT support for construction planning: A system design based on integrated information, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Karhu, V (2001) A generic construction process modelling method, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Löfgren, A (2008) Making mobile meaning: Expectations and experiences of mobile computing usefulness in construction site management practice, Unpublished PhD Thesis, Trita-IEO, KTH Royal Institute of Technology.

Laitinen, J (1998) Model based construction process management, Unpublished PhD Thesis, , KTH Royal Institute of Technology .

Leiringer, R (2003) Technological innovations in the context of public-private partnership projects, Unpublished PhD Thesis, TRITA-IEO, KTH Royal Institute of Technology.

Lindblad, H (2019) BIM in translation: Exploring client organisations as drivers for change in construction, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.

Lindfors, C (2003) Process oriented information management in construction, Unpublished PhD Thesis, TRITA-IEO, KTH Royal Institute of Technology.

Marteinsson, B (2005) Service life estimation in building design: A development of the factor method, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Mirzadeh, I (2014) More roads for the money, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Ntiyakunze, S K (2011) Conflicts in building projets in Tanzania: Analysis of causes and management approaches, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Nyström, J (2007) Partnering: Definition, theory and evaluation, Unpublished PhD Thesis, Trita-BFE, KTH Royal Institute of Technology.

Parsanezhad, P (2019) Towards a BIM-enabled facility management: Promises, obstacles and requirements, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.

Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings, Unpublished PhD Thesis, Meddelande. Institutionen för byggvetenskap, KTH Royal Institute of Technology.

Schönbeck, P (2022) Data based configuration decisions in hospital construction projects, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications, Unpublished PhD Thesis, Trita-BKN. Bulletin, KTH Royal Institute of Technology.

Tarandi, V (1998) Neutral intelligent CAD communication: Information exchange in construction based upon a minimal schema, Unpublished PhD Thesis, , KTH Royal Institute of Technology.

Uggla, G (2021) Model and reality: Connecting BIM and the built environment, Unpublished PhD Thesis, TRITA-ABE-DLT, KTH Royal Institute of Technology.

Unger, C (2006) Industrialised house building: Fundamental change or business as usual?, Unpublished PhD Thesis, Trita-IEO, KTH Royal Institute of Technology.

Uttam, K (2014) Seeking sustainability in the construction sector: Opportunities within impact assessment and sustainable public procurement, Unpublished PhD Thesis, TRITA-LWR. PHD, KTH Royal Institute of Technology.

Vass, S (2017) The business value of BIM: Elaborating on content and perspective, Unpublished PhD Thesis, TRITA-FOB, KTH Royal Institute of Technology.

Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement, Unpublished PhD Thesis, TRITA-FOB, KTH Royal Institute of Technology.

  • Type: Thesis
  • Keywords: competence; competition; construction cost; construction firms; governance; improvement; infrastructure project; knowledge management; procurement method; quality assurance; training; client; culture; efficiency; transaction cost; interview; project perfo
  • ISBN/ISSN:
  • URL: http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-47448
  • Abstract:

    The performance of the construction industry and its contribution to the welfare of society in comparison to other industries such as the manufacturing industry has lately been the focus of many commissioned reports and academic research publications. The so-called “iron triangle” of time, cost and quality have been the most important metrics of construction project performance, especially for the selection of appropriate procurement methods. The perceived inefficiencies emanate from, among other things, increasing construction costs, conflicts and client dissatisfaction, the fragmented nature of the industry, low competition, cost overruns and delays, and lack of quality improvement. There is observed disparity in increases in housing construction costs and an apparent lack of quality improvement of infrastructure transport projects. In Sweden, metropolitan regions experienced higher construction cost increases, while small regions showed less costs increases during economic booms. In order to address these perceived inefficiencies, numerous strategic and project level decisions that influenced the way that publicly owned properties and projects are procured, constructed, operated, and maintained have been made. The decision to transfer quality-related activities and quality assurance responsibilities from client to contractor approximately 25 years ago is one of the decisions that could have an impact on current quality of infrastructure transport projects. The disparity in increases in construction costs and quality improvement concerns could not only influence the performance of construction projects, but also can affect the way different actors in the sector interact with each other and achieve their divergent objectives. The aim of this study is twofold. First, it tries to explain the observed disparity increases in construction costs between big (metropolitan) and medium/small regions. Second, it attempts to ascertain the extent of quality problems in infrastructure transport projects after the transfer of quality assurance responsibilities, and suggests measures that could improve the quality of infrastructure transport projects. Surveys and interviews were used as a means to collect data concerning both supplier structure in relation to housing construction costs and quality of construction projects. Other empirical data from a secondary source were also used. The first part of the research offers an understanding of the behavior of contractors in specific economic situations, specifically by taking into consideration the long-run relationship between contractors and owners/developers. It ascertains that if contractors/subcontractors display opportunistic behavior during the economic boom, the result will be increased higher construction costs. We utilized transaction cost theory in exploring construction sector structures in an attempt to understand changes in the sector from an efficiency perspective. The analysis can also enrich the current understanding of the governance structure of Swedish construction firms and how they could influence construction costs. As the response from the survey suggests, quality of infrastructure projects has not decreased after the transfer of quality assurance from client to contractor. However, the high number of respondents that indicated quality is the same as before the transfer raises a concern of lack of quality improvement. Respondents have overwhelmingly indicated that the lack of public client competence was one of the contributing factors of quality problems. It is argued that with client competence it is important to build-up through proper knowledge management, incentive systems, and training. Further, the retention of new skilled and experienced workers is an essential element for continuous quality improvement goals and objectives. A second opinion practice from independent experts and committees that focuses on the quality aspect of the projects can be introduced in the provision of infrastructure transport projects. Finally, it is argued that without c ient competence and a company culture that creates the right incentives, no procurement method can guarantee high quality.

Zika-Viktorsson, A (2002) The industrial project. Studies of the work situation of project members, Unpublished PhD Thesis, Trita-MMK, KTH Royal Institute of Technology.